Power Station

The combined-cycle power station, which will primarily power the concentrator circuit, will generate the equivalent amount of electricity as the existing Pilbara grid.

The power station is the first combined-cycle, gas fired power station in the Pilbara. Seven gas turbines, three steam turbines and six heat recovery generators will produce 450 megawatts of energy for the project.

Quick Facts

  • 450 megawatt combined-cycle, gas fired power station
  • 3 sets of Co-generation units and 1 open cycle unit:
    • 7 gas turbines with 47MW
    • 3 steam turbines with 58MW
    • 6 heat recovery steam generators with 20MW
  • 40 per cent less emissions than a conventional power plant
  • Multiple recovery mechanisms built into design
  • Underwriting new gas field development

To read more about our award winning power station click here